1. Construction preparation
Sima: Ordinary Portland cement above No. 325 should be used, or Portland slag cement can also be used. When there is an aggressive medium, it should be selected according to the design requirements.
kirikiri: Use medium sand, which must not contain debris. The mud content must not exceed 3%, and it must be passed through a 3-5mm sieve before use.
Main equipment: mihini pahuka, mortar mixer, iron trowel, broom, wooden trowel, scraper, etc.
2. Layer treatment: clean up and sweep the debris, and moisten it with water.
3. Preparation and use of foam
The foam used in foam concrete should be prepared with a special cement foaming machine. The diameter of the foam should be controlled between 0.5-2mm, and it should be elastic and not easily broken. The concrete foam should be prepared and used, and the retention time should not be longer than 20 meneti.
4. The leveling layer and the insulation layer should be constructed at the same time.
The slope of the insulation layer should meet the design requirements. The junction between the base layer and the protruding roof structure (parapet, gable, skylight wall, deformation joint, chimney, etc.) and the corner of the base layer, the insulation layer All should be made into a circular arc; the leveling layer should be made into a slightly lower pit around the water drop of the internal drainage.
5. When the total thickness exceeds 10cm, it should be constructed in layers.
6. Use structure to find slope for flat roof, and the slope should not be less than 3%; use material to find slope, and the slope should be 2%; for gutter and eaves to find slope longitudinally, the slope should not be less than 1%, and the water drop at the bottom of the ditch should not exceed 150mm .
Precautions for foam concrete roof insulation construction:
1. When the density is lower than 300kg/m3, the accelerator should be used during construction. The amount of accelerator is generally 2%-8% of the cement amount. The amount of accelerator should increase or decrease according to the type of accelerator, construction temperature and engineering requirements. The specific increase or decrease should be determined by experiment.
2. The temperature at the construction site should not be lower than 5℃.
3. After construction, it should be moisturized and maintained.
Features of foam concrete roof insulation:
1. Weahanga wera: the thermal conductivity is 0.080-0.16W/(m·k), me te ātete waiariki e pā ana ki 20-30 he wa ki te raima noa.
2. Maamaa: Ko te 300-700kg/m3 te kiato rahi maroke, ko tenei 1/5-1/8 o te kiato o te raima noa, ka taea te whakaiti i te taumahatanga katoa o te whare.
3. Integrity: on-site pouring construction is closely integrated with the main project, without boundary gaps and vent pipes.
4. Waihanga oro: Foam concrete contains a large number of independent bubbles, and they are evenly distributed. The sound absorption capacity is 0.09-0.19%, ko tenei 5 he wa ki te raima noa, and it has an effective sound insulation function.
5. Compressive resistance: The compressive strength is 0.3-2.2Mpa.
6. Te ātete wai: relatively independent closed bubbles and good integrity, so that it has a certain waterproof performance.
7. Anti-crack: low shrinkage rate, crack resistance is 8 he wa ki te raima noa.
8. Te mauroa: the same as the life of the main project.
9. Hanganga ngawari: no need to find a slope for the flat roof.
10. Ohanga: 20-50% lower than the comprehensive cost of other roof insulation materials.